Skip to Content

Lean principles / Milk run

Milk run: a fixed round brings only what is needed to the line

The milk run replaces forklift trips with a round on a fixed schedule: the tugger train passes the same stops, delivers full containers and collects the empties. The mizusumashi, the operator who drives it, reads the kanban cards and reorders. Here you will find the trains, dollies and stops we use to implement it on our customers' shop floors.

Request an on-site visitRequest a quote

LiftLiner tugger train with KLT containers in a warehouse
The train

LiftLiner and Taxi Liner

The dollies

KLT containers in convoy

The stops

Park Station and FIFO lanes

The autonomous round

Once the route is stable

3D tour

Follow the milk run train

A fixed loop from the supermarket to the assembly line: K.Hartwall train with LiftLiner and Taxi Liner, Park Station at the stops, Green Frame workstations loaded from behind, kanban and ORGATEX signage along the route. Tap a label to see the solution up close.

Open full screen

Why the milk run cuts costs and forklifts

A forklift carrying one pallet at a time, whenever the driver is free, builds up lineside stock and clogged aisles. The tugger train delivers all the materials for several workstations in a single round, at a pace the line knows.

It works if trolleys can be loaded and unloaded without tools, if every load has a fixed stop and if the empties return in the same round. These are the three points the products on this page address.

How to spot it on the shop floor

Signal 1

Forklifts on the shop floor among operators, running empty on the way back.

Signal 2

Material delivered “on call”: the line waits or fills up with stock.

Signal 3

Trolleys left wherever, with no marked parking spot.

01

The tugger train: several loads in a single round

Hooks up to the electric tractor and brings pallets, cages, KLT containers and kits to the line without forklifts.

The problem

One trip per pallet, with loading and unloading that need a forklift even at the lineside.

The solution

LiftLiner® lifts the trolleys in the bay and sets them down on the floor in a few seconds; Taxi Liner carries 600×400 dollies in separate bays that can be picked in any order.

LiftLiner

LiftLiner

Patented tugger train

Up to 8 trolleys per round, 1,000 kg per bay, lifts the trolley in under 3 seconds; also with an AGV tractor.

See product

LL trolley

LL trolley

Pallets and cages

Push it into the bay and the LiftLiner lifts it; off the train it is pushed by hand. Capacity up to 1,000 kg, three sizes.

See product

LL Taxi trolley

LL Taxi trolley

KLT containers, boxes and kits on 3 shelves

1200×800 mm base, 500 kg capacity; loads and unloads from both sides without manual lifting.

See product

Taxi Liner

Taxi Liner

3 bays for 600×400 dollies

Ramps that open with a lever: take the dolly you need without unhooking the others. 750 kg per trailer.

See product

See also: Tugger train and milk run · Selection guide to dollies, trolleys and FIFO lanes

02

Dollies: the container travels on its own trolley

KLT dollies that hook together in convoy: from the supermarket to the workstation with no transfers.

The problem

Containers moved by hand from one trolley to another, bent backs to pick from low down.

The solution

Dollies with Easy Lock drawbar and hitch that form the train on their own, raised version for picking at the right height, milk run drawbar to pull rows of dollies.

Dolly Type VII B

Dolly Type VII B

In convoy

Sliding drawbar and Easy Lock hitch: 250 kg per dolly, up to 1,000 kg in the train.

See product

Dolly Type VII C

Dolly Type VII C

Raised deck

The KLT arrives already at picking height; for kits and light components.

See product

Milk run drawbar assembly

Milk run drawbar assembly

From the tractor to the dollies

Pulls one or two rows of 600×400 dollies or pallet dollies; releases with a foot pedal.

See product

R-KLT container

R-KLT container

VDA 4500 standard

Reinforced base and label holders for the kanban card; 5 sizes.

See product

See also: Dollies for KLT containers · Pallet dollies and shelf trolleys

03

The stops: every load has its place

Stops marked on the floor and FIFO lanes: whoever delivers and whoever picks always know where to go.

The problem

Trolleys parked crooked, full and empty mixed together, picks that skip the order of arrival.

The solution

Park Stations that hold the trolley castors always in the same spot and FIFO rails that guide dollies from the loading side to the picking side.

Aluminium Park Station

Aluminium Park Station

The trolley always stops there

Floor guides that hold the front wheels during loading and picking.

See product

Plastic Park Station

Plastic Park Station

Trolley position at a glance

Yellow rail with flexible sides, for trolleys up to 150 kg.

See product

FIFO Monorail 40 mm rail

FIFO Monorail 40 mm rail

Compact FIFO lane

Guides the wheels on one side only: the lane takes up little space and stays straight.

See product

FIFO Station rail

FIFO Station rail

PVC FIFO lane

Load on one side, pick from the other; glued to the floor and screwed down where needed.

See product

See also: Park Station · Floor FIFO lanes · FIFO lane configurator

04

The round becomes autonomous

Once stops and trolleys are standardised, a robot can do the round in place of the operator.

The problem

The mizusumashi spends half the shift driving the train instead of managing kanbans.

The solution

PUDU AMRs that slide under trolleys, lift them and take them to their destination, with no magnetic tape or reflectors.

Pudu T300L

Pudu T300L

Lifts trolleys up to 300 kg

Slides under dedicated racks and trolleys, latches onto them and drops them off at their destination.

See product

Pudu T600 Underride

Pudu T600 Underride

255 mm high, up to 600 kg

Lifts the shelves and trolleys you already use from the centre, passes through 65 cm.

See product

See also: Autonomous logistics · Logistics robots

Tools to get started

Dolly, trolley and FIFO lane selection guide

Dollies, milk run and Park Station

FIFO lane configurator

Build your rails and end pieces

Internal material handling

Example flows from warehouse to line

Have an industrial project to develop?

Choose where to start. Or call us: +39 0434 572757.


Robot demo at your site

We bring the robot to your shop floor and you see it working on your own routes.

Request a demo


On-site visit

We come to see your shop floor, flows and spaces, and propose the right solution.

Request an on-site visit


Floor marking sample

Receive a tape sample to test on your floor before you order.

Request a sample


Dedicated quote

Send us the list of what you need: we'll reply with a tailored quote.

Request a quote